Preparation of Bidding Documents forReconstruction ofkm 0+000 – km 46+000 Section of M5,Yevlakh-Zagatala-Georgian Border Road

On the basis of continuous cooperation with the company “Kocks Consult Gmbh”, “GMC Consulting” MMC M5, Yevlakh-Zagatala-Khaldan-Suchma section of the border road with the Republic of Georgia from km 0+000 to km 46+000 (km 0+300-km 33+100) (Lot 1), provided consulting services in the preparation of tender documents for the reconstruction of the Suchma-Sheki ring road section (km 33+100-km 46+120) and the rehabilitation of the R57 highway (Lot 2).


Project description:

Under the Loan 3144 AZE: Second Road Network Development Program (MFF2), Project 2 was financed by the Asian Development Bank (ADB) for the Project.

The project consisted of two road segments: (i) M-5 Road which starts after the first roundabout with M-4 at Khaldan (before a small Y junction) and ends at the Y junction to Shaki, with a total distance of around 46.5 km; and (ii) R-57 Road, which starts at the Y junction with M-5 and ends at the roundabout at the entrance to the main city of Sheki, having a length of around 11km. The M5 segment was reconstructed to Category II, while R-57 shall be at Category III.

The Project Commencement date was the 22nd of August 2017 and completed in January 2018. The Contract Price was 843,924.20 AZN (496,426.00 USD).